Bills of Materials (BOMs)
See costs on a BOM
Turn on Calculate cost to see what a batch costs while you write its BOM, from each material's cost in inventory. Turn it on. Open a draft BOM. In the Summary…
Turn on Calculate cost to see what a batch costs while you write its BOM, from each material's cost in inventory.
Turn it on
- Open a draft BOM.
- In the Summary on the right, turn on Calculate cost.
The switch is off by default. A published BOM is read-only, so you can't change the switch there. Start a new version to change it. A new version keeps the setting.
What you see
With Calculate cost on, the BOM shows a Cost column on its lines, the batch cost, the cost of the steps and the finished goods cost per unit. The Summary adds Materials cost and the cost per unit.
Materials with no cost
When a material has no cost in inventory, its line asks for a cost and a unit. With more than two missing, an Add missing costs panel lets you fill them in together. A total that still misses a cost shows so far.
A cost you type here stays on this BOM only. It isn't copied to a new version or a duplicate, and it never changes the material's cost in inventory.
Good to know
- Operators and Viewers see the figures when Calculate cost is on, but they can't change the switch or type a cost.
Related articles
Still need a hand?
Our support team is here when you need a person.