Labor, electricity and overhead settings
Updated October 27, 2026
On this page (5)
Set the costs that apply across your whole workspace: overhead, electricity, labor tracking and the margin bands that flag a product. Every BOM estimate and production run uses them.
Set your cost settings
Go to Settings, then Costing.
- Enter the Overhead percentage. It's added on top of materials, labor and electricity.
- Enter your Electricity rate per kWh.
- Turn on Track electricity cost to include electricity in production cost. Turn on Track labor cost by default so new BOMs start with labor tracking.
- Choose the Margin cost basis: Last production actual or Current BOM estimate.
- Set the Target margin, the Low margin threshold and the Cost change alert.
- Click Save cost settings.
Kerno saves the settings and recomputes your current BOM estimates. With 10% overhead, a tin estimated at $3.04 became $3.35.
Add equipment for electricity
Electricity is worked out from the equipment a step uses.
- Go to Settings, then Resources, and click Add resource.
- Type the Name, such as Wax Melter.
- Enter its Power in kilowatts. Leave it empty if the step records kWh directly.
- Click Add resource.
The Resources page lists each one with its power and its cost per hour at your rate. On a BOM step, pick it under Resources / equipment. The step's electricity is the resource's power times the step's hours.
Labor
Labor is set per step in the BOM: turn on Track Labor Cost in Production Steps and enter each step's Labor rate per hour. A run's labor uses the step times you record. See Production steps, labor and packaging.
Good to know
- A product is Healthy at or above the target margin, Watch between the two and Low below the low margin threshold.
- The Cost change alert notifies admins when a material's price moves more than its percentage.
- Inactive resources are hidden when adding steps to a BOM.
Related articles
Still need help?
Can't find what you're looking for? Our support team will help.